Skip to main content
SMCSD Logo Sausalito Marin City Sanitary District

News

Treatment Plant Operations Photos

Page 1 of 1
  • image097

    Jan 2021

    The diffuser at the end of the outfall where the fully treated and disinfected wastewater is released to the Bay.

  • image095

    Jan 2021

    An outfall inspection diver suiting up.

  • image091

    Jan 2021

    Operators using a variety of tools to repair and replace plant equipment

  • image089

    Jan 2021

    Operators are shown here maintaining all the walking and common areas.

  • image087

    Jan 2021

    Operators are protecting and wrapping pipe and valve equipment from corrosion and water exposure.

  • image085

    Jan 2021

    The rags and debris now captured at the spiral screens are inspected to prevent clogs and ensure removal at the top of the screens.

  • image083

    Jan 2021

    Operations & Maintenance Staff inspecting one of the spiral screens in anticipation of wet weather.

  • image081

    Jan 2021

    Debris captured at the spiral screening is moved through the use of a screw conveyor to a solids waste bin.

  • image079

    Jan 2021

    The new Headworks allows for the isolation of equipment by the use of gates during routine maintenance and repairs.

  • image077

    Jan 2021

    A vactor truck is being used to remove accumulated grit and grease from the primary clarifier.